Designs

In this project we were asked to design a temporary unit for the artist who came to Cactus at the kanaaleiland in Bruges.

In this project the task was to create a semi-detached building, we couldn’t go higher than the neighbours gutter for fire safety which made that we couldn’t go over the full width with the whole building.

This project was a collaboration with another student, where for the first time in our study career we needed to design a public open garden. The implementation task was to create a bundle for the environmental counter, wich included plans for the fire departement. Also the ground floor was designed for a person in a wheelchair.

In this project we came into contact with timber frame construction for the first time. The task was to make an addition of a school building with student housing, and when we got to the implementation phase, to draw up some details.

In this project we got asked from the city Bruges to design a new school and housing for different types of families on the Building Site ‘de pannebeke’. This was a group project with 10 students, but for the implementation phase everyone went their own way with different construction methods from steel to wood to ….